Projects
VJ Engineering was founded on the firm belief of providing high quality engineering services at reasonable cost. With four offices serving the Mid West, VJ Engineering is able to provide a high level of Client support on projects, no matter what size or complexities. Clientele includes private developers, architects, institutions such as universities and hospitals, industry, and other governmental agencies.
VJ Engineering seeks projects in Iowa, Illinois, Nebraska, New Mexico, Missouri, and Wisconson. With each new project, a specific team is assigned from planning to completion. Their goal is simple: provide quality services in a proactive manner, by responsive communication to meet targeted budgets and schedules.
A review of past work accomplishments is ample evidence of the Firm's ability to produce quality custom engineering work of substantial size within reasonable time frames and construction budgets.
Bridges
Commercial
Industrial
Award Winning Projects
Scope of Services
Pre-Design Planning |
Design Services |
Post-Design Services |
Inspection |
Feasibility Studies
Location Studies
Concept Development
Bridge Hydraulics
Schematic Design
Cost Estimates |
Structural Design
Bridge Design
Civil Site Design
Specifications
Plan Issue |
Bid Assistance
Construction Management
Coordination
Construction Inspection
Submittal Review
Materials Testing |
Bridges
Bridge Sounding
Crane Systems
Buildings |
For more information on our expertise we invite you to peruse our gallery of award-winning projects. On this page you will see structures designed by NNW that have been recognized for innovative design and engineering aptitude. Design Awards. On September 15, 2006 NNW was the recipient of the ASCE Oustanding Civil Engineering Project Achievement Award 2006 for our work on the Iowa River Power Pedestrian Bridge and Gazebo located in Coralville, Iowa.
Iowa River Power Award
Home| |Contact Us| |About US| |News Desk| |Projects| |Staff |
For questions and comments about this site, contact:
roneil@vjengineering.com
Page modified by webmaster, April 27, 2010